Clinic AHU replacement
- Building
- Two-story outpatient clinic
- Scope
- 2 air handlers, 18,000 CFM total; controls
- Schedule
- 9 weekends
Phased so one wing always had conditioned air.
Commercial HVAC & piping · Fictional contractor
Design-assist, install and service for occupied clinics, schools and commercial property. Sample qualifications package for general contractors and owners.

Markets

Occupied-facility work where infection control and uptime come first.
Typical scope
How we work there
Projects · fictional scenarios
Phased so one wing always had conditioned air.
Scissor lifts on floor protection; complete before fall practice.
Tenants open throughout; one crane setup per day.
Temporary bypass kept the loop live.
Qualifications package
| Item | How a real site would present it | In this sample |
|---|---|---|
| Licensing | License numbers and states, linked to the issuing board | Placeholder; no credentials claimed |
| Insurance & bonding | Carrier, limits, bonding capacity on request | Request-only, not shown |
| Safety program | Written program, training approach, site-specific plans | Described in general terms |
| Self-performed trades | Sheet metal, piping, controls, TAB coordination | Listed above |
| References | Owner and GC contacts, by permission | None; business is fictional |
Bid inquiry · simulated
Fictional business · Website design demo
Style 24 · Engineered & direct. Samples show visual direction and illustrative content/features—not package inclusions. We agree your selected pages, layouts and features in the written quote before deposit.